Admin Job Conflicts (3.x.x and earlier)

From Obsidian Scheduler
Jump to navigationJump to search

Job Conflicts can be configured to prevent jobs in the same set from running at the same time.


Adding and Removing Groups

Add new conflicts by clicking the Add New Group link in the non-conflicted group. You can then drag and drop jobs from the non-conflicted set or other conflict sets.

Note: The order of jobs within a conflicted set indicates which job takes priority. Jobs at the top are given priority over those lower down, and will be executed first when conflicts arise.